
Gateway WA
Client: Main Roads WA
Value: $1billion
Time Frame: 2012 to 2016
Description:
The Gateway WA project was, at the ...

Forrestfield Airport Link
Client: Public Transport Authority of Western Australia (PTA)
Value: $1.2Billion
Time Frame: 2016 to 2020
Description:
The Forrestfield Airport ...

Transforming Freeways
Client: Main Roads WA
Value: $1.5 Billion
Time Frame: 2016 to 2030
Description:
The Transforming Freeways project is an ...

Metronet, Thornlie Cockburn Link
Client: Client: Public Transport Authority of Western Australia (PTA)
Value: $ 800 million
Time Frame: 2017 to ...

OneSteel Whyalla
In late 2017 IQE was approached by Arrium Steel Whyalla to undertake a Mine to ...

Warragamba Dam NSW
IQE and the Rhead Group are preparing a cost benefit study for the WaterNSW concept ...
Perseus Mining
Perseus Mining operates in the upper western region of Africa, primarily in Nigeria and Mali. ...
Tiger Resources
Tiger Resources operates in the DRC region of Africa, owning and operating a copper mine ...