Warragamba Dam NSW

IQE and the Rhead Group are preparing a cost benefit study for the WaterNSW concept design for the raising of the Warragamba Dam, as part of the the WaterNSW Flood Strategy proposal to raise Warragamba Dam by around 14 metres for flood mitigation.

IQE has provided detailed first-principles project cost estimation and construction risk assessment.