Forrestfield Airport Link

Client: Public Transport Authority of Western Australia (PTA)
Value: $1.2Billion
Time Frame: 2016 to 2020

Description:
The Forrestfield Airport Link project connects with Transperth’s existing Midland Line, close to Bayswater station to provide a new 8.5km twin track line to a new station at Forrestfield. The project involves 7.5km of twin bored rail tunnels and three new stations at Redcliff, Airport Central and Forrestfield.

The bored tunnels are being constructed in tandem and will cross under both Perth International Airport and the Swan River.

IQE Role:
• Preliminary budget estimate
• Detailed budget estimate with full risk evaluation to Federal Guidelines
• Tender evaluation of D&C proponents
• Ongoing risk analysis to confirm project contingency